Nos disfrazamos de calabaza - Hasta 50%dto  Ver más

Enviar a
Montevideo, Montevideo
0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional

Selecciona tu país

América

Europa

Resto del mundo

portada Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
58
Encuadernación
Tapa Blanda
Dimensiones
28x21.6x0.3 cm
Peso
0.16 kg.
ISBN13
9781505875126
Categorías

Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress (en Inglés)

Congressional Research Service (Autor) · Createspace · Tapa Blanda

Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress (en Inglés) - Congressional Research Service

Libro Nuevo Importado
Envío: 19 a 25 días háb.
$ 2.370$ 1.185
-50%
Costos de importación incluídos en el precio ✅
Libro Nuevo

Quedan más de 100 unidades

$ 1.185
Llega entre el 30 Nov y el 08 Dic a Montevideo, Montevideo. Seleccionar ubicación

Reseña del libro "Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress (en Inglés)"

The Navy's proposed FY2015 budget requests $1,219.3 million for continued research and development work on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy has identified the Ohio replacement program as its top priority program. Under the Navy's FY2012 budget, the first Ohio replacement boat was scheduled to be procured in FY2019, and Ohio replacement boats were to enter service on a schedule that would maintain the Navy's SSBN force at 12 boats. The Navy's FY2013 budget deferred the procurement of the first Ohio replacement boat by two years, to FY2021. As a result of the deferment of the procurement of the lead boat from FY2019 to FY2021, the Navy's SSBN force will drop to 11 or 10 boats for the period FY2029-FY2041. The Navy says the decline to 11 or 10 boats during this period will be acceptable in terms of meeting strategic nuclear deterrent mission requirements because none of the 11 or 10 boats during that period will be encumbered by lengthy maintenance actions. The Navy in June 2014 estimated the procurement cost of the lead ship in the program at $12.4 billion in constant 2014 dollars, including $4.8 billion in detailed design and nonrecurring engineering (DD/NRE) costs for the entire class, and $7.6 billion in construction costs for the ship itself. The Navy in April 2014 estimated the average procurement cost of boats 2 through 12 in the Ohio replacement program at about $5.36 billion each in FY2010 dollars, and is working to reduce that figure to a target of $4.9 billion each in FY2010 dollars. Even with this cost-reduction effort, observers are concerned about the impact the Ohio replacement program will have on the Navy's ability to procure other types of ships at desired rates in the 2020s and early 2030s.

Opiniones del libro

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes